Here we can see in closeup the B has structural problems. Some of the spikes have fallen off. So it is a danger to the public. There was a Legal Battle over the fault and the money it cost to build was recovered. (1.42 million ). In side there has been put a time capsule to be opened in the year 20030.
No comments:
Post a Comment